Day 2... the carcass of the new sink is in place and the new sink fitted. All of the tiles are stripped from the walls in preparation for the wall painting and the new tiles. The internal layout of the kitchen is changed so that we can now accomodate both a new catering stove and a new catering dish washer.
Day 3... the new work tops have now been fitted and we can see the big difference it has made to have one piece of worktop all the way from the door to the new sink. We have also put in the new unit that will sit next to the fridge on the far side of the kitchen.